切换:中文

Si Chuan RuiDiTong Construction Machinery CO.,LTD扒渣机 耙斗机 电耙子 四不像 四不像矿车 专业制造

Home > Product > Sand grinder, pick up machine, rock loader.

Sand grinder, pick up machine, rock loader.

Sand scraper | slag scraper | scraper | loader | sand climber | slag scraper, which is mainly used for slag loading in tunnels of mining enterprises, is the main equipment for loading in tunnels of ea...

Sand scraper | slag scraper | sand scraper | sand climber | rock loader is the main equipment of early mine tunnel loading. It can replace manual loading operation in underground mine. The whole set is made up of machinery. As long as there is no shortage of gear oil in gearbox and drum and the gear oil is replaced on time, there will be no bad gear in all loading. Rock gear is occupied by fire, durable and durable. The premise of picking and loading machine working in underground is that the underground roadway needs to have installation track, slope less than 30 degrees, non-high gas coal mine. Our company produces and sells pickpockets and rock loaders. The whole plate is made of thick steel plate mixed with wear-resistant manganese steel, so it is suitable for back and forth friction in long-term rake bucket.

耙斗机_扒装机

P-15耙斗机 扒装机 装岩机

Model P15 rake loader is suitable for use in tunnels of 2 m *2 m in size. Eleven KW explosion-proof motor is selected for P15 rake loader motor. Theoretically, the load per hour is 15-25 cubic meters, the volume of a rake is 0.15 cubic meters, the traction force of the main drum is 7.2-10.4 KN, and the standard wheel spacing is 600 mm. The main drum is suitable for steel wire rope 12.5, and vice drum can use 9 steel ropes. The size of the whole machine is about 4720 x 1150 x 1600. The main part of rock loader of picking and loading machine is driven by planetary wheel. The series of rake bucket machines have the characteristics of high rock loading efficiency, simple structure, good reliability, easy operation and wide application range. The rake bucket machine can not only be used in roadways, but also in inclined roadways below 30 degrees. It is to improve the speed of excavation and realize mechanization of roadway excavation. A major mechanical device.

耙斗机_扒装机

P15耙斗机 扒装机 扒沙机在工地上的使用照片

 

耙斗机_扒装机

P30耙斗装岩机 扒装机 装岩机

P30 loader is suitable for use in tunnels of 2.5 m 2.5 m or above. The explosion-proof motor of P30 rake bucket machine is 17KW. In theory, the load per hour is 35-50 cubic meters, the volume of a rake bucket is 0.3 cubic meters, the traction force of the main drum is 13.5-19.5 KN, and the standard wheel spacing is 600 mm. The main drum is suitable for the wire rope 12.5~15.5, and the auxiliary drum can use 9 steel ropes. The size of the whole machine is about 6600 x 1305 x 2000..

About maintenance of rock loader in skid loader:

1. After electrical wiring, attention should be paid to the direction of rotation of the drum. When working from the side of the reducer, the drum should rotate counterclockwise. When the direction of rotation of the two drums is opposite at the same time, the one that is working should prevail.

2. Always pay attention to whether the tightness of brake band and auxiliary brake band is appropriate, whether the winch rotates flexibly and whether the work is reliable. If it is found that the inner gear can not be held or taken off, the adjusting bolt of brake band should be adjusted to make it suitable.

3. Check the wear condition of wire rope regularly. Replace the wire rope when it breaks.

4. Butter is added once a month to the rope wheel bearings, 90-150 industrial gear oil is added to the winch reducer every three months, and 90-150 industrial gear oil is added to the planetary gear rotating part every month.

5. When refueling the planetary transmission part, attention should be paid not to make the oil fall on the brake surface and brake belt of the drum. If oil stains are found in the above parts, they should be wiped clean.

6. When using in roadway, the oil level of oil mist in pneumatic system should be checked every day. If it is found that the oil level is insufficient, the lubricant should be added in time.

7. Always pay attention to whether the wire rope joint is reliable and reliable.

8. Check every week whether the connecting bolts are loose or lost, tighten the loose parts and fill in the missing ones.

9, clean up the machine once a week, clean up the gangue, slag and mud.

Main product:我们主要生产销售:扒渣机,耙斗装岩机,耙矿绞车,电耙子,四不像,四不像矿车,矿用四轮车,柴油四轮车,调度提升绞车,小型装载机,铲车。 If you need above products,pls call our hot-wire telephone.

18030527037

Copyright © pazhaji.com 2009 Chengdu RuiDiTong Construction Machinery CO.,LTD
Home | About Us | Contact | 中文

蜀ICP备18025132号-1
分享到: